Introduction- desilter
Desilter is in third level of purification equipment in mud solid control system. It is designed by take the principle of particle settling into consideration. Drilling fluid as separating medium of desilter can generate a certain pressure and speed when it go through sand pump. Then it will spiral into the mud removing device along the inner wall of the cyclone. The coarse particles will spiral down follow the inner wall of cyclone powered by centrifugal force and the gravity. And drilling fluid then will be discharged from underflow opening. When the drilling fluid falls below the breakdown of shale shaker and then it separate, the rest of the media along the spiral cyclone.
Installation and debugging- desilter
The desilter should be installed behind the desander, in other world-second tank tail. The base of desilter must be stable.
Coupling pipeline which used in the connection of desilter inlet and outlet and other equipment ought to adapt hose line. Also you’ better reduce the length and turn as far as possible. The tightness of the screen mesh is suitable and after tension, the screen should be smooth without wrinkles.
Maintenance-desilter
You can check and confirm correct connection and sealing part. If long-term disabled, the cyclone should circulation clean with water, in order to avoid accumulation of dry sand in the cyclone. You should repair or replace worn and damaged, swirling tube leakage. After the shutdown of desilter, you should clean shale shaker. You can check if the nozzle is damaged.
Torlins as an oilfield desiltermanufacturer will offer you oilfield desilter with high quality and suitable price as you want. Please contact us. It is waiting for you.